BIOSAM UT TREATMENT PLANT COMMISSIONED IN LIBYA
Author: Nicola
November 2009: Final commissioning of a 600 PE Biosam UT treatment plant in Libya. The system uses an existing septic tank as primary settlement, and pumps up the settled wastewater to two media tanks which are followed by two hopper tanks. The effluent goes through sand filtration and chlorination to make it useable as second class water for irrigation.





More News
 Tel: +44(0) 28 302 66616
Greenbank Industrial Estate, Newry, BT34 2PB, N. Ireland
Pumps  Pumping Stations  Pump Monitoring & Control  Booster Pump Sets  Sewage Treatment Systems  Wastewater Treatment Products  Building Services Products  Motor Rewinds  Technology Transfer  Design & Contracting  Service, Operation & Maintenance  Sitemap
 © 2007 FM Environmental Limited. All Rights Reserved.
Design by Eweb Newry