Foalies Bridge, Belturbet  -  FOALIES BRIDGE, CO. CAVAN
 
Requirement: Wastewater Treatment
Solution: BIOSAM Sewage Treatment Plant
Completion Date:
Scope of Works: Installation of BIOSAM sewage treatment plant to serve 23 houses with a maximum population equivalent of 184 persons, at Foalies Bridge, Belturbet, Co. Cavan. This is designed to support a holiday home development, with a view to potentially allowing for permanent settlement.
Discharge Standard Required: BOD - 10mg/l
Suspended Solids - 10mg/l
Ammonia as N - 5mg/l
Partial Nitrate reduction - 25-30mg/l (further nitrate reduction by reed bed)
Total Phosphates as P - <1mg/l
Plant Supplied: Grundfos forward feed pumping station, 1no BIOSAM-AMMONIA modular 200 person treatment plant, upward flow clarifier, final effluent pumping station followed by reedbed and wetlands. The BIOSAM Treatment Plant incorporates a primary tank, followed by Ammonia reduction module, aeration, final settlement and upward flow clarifier. The treated effluent is then pumped to a reed bed before being discharged into nearby Lough Dooley.
 
   
More Case Studies
 
 Tel: +44(0) 28 302 66616
Greenbank Industrial Estate, Newry, BT34 2PB, N. Ireland
Pumps  Pumping Stations  Pump Monitoring & Control  Booster Pump Sets  Sewage Treatment Systems  Wastewater Treatment Products  Building Services Products  Motor Rewinds  Technology Transfer  Design & Contracting  Service, Operation & Maintenance  Sitemap
 © 2007 FM Environmental Limited. All Rights Reserved.
Design by Eweb Newry