Archirodon Construction (Overseas) Co. SA  -  TRIPOLI, LIBYA
 
Client Requirements: Packaged Mobile Plant - compact footprint
Solution: Above ground BIOSAM
Capacity: 100m3 /day

Population Equivalent: 500


Project Description: Design, Manufacturing, Supply and Commissioning of an above ground modular BIOSAM Sewage Treatment Plant, that is capable to cater for a population equivalent of 500 people. The plant installation required minimal civil works on site, and has been exported on flat-rack containers, including a prefabricated control room, custom designed to withstand high temperatures, pertinent on site. It is also equipped with tertiary filtration, to achieve an effluent standard of 10:10mg/l BOD:SS, and treated wastewater can be re-used for surface irrigation. The tanks are complete with ladders and railings for easy and safe access, whilst they can easily be transported from one site to another in case of camp re-location.

Completion Date: November 2009


 
   
More Case Studies
 
 Tel: +44(0) 28 302 66616
Greenbank Industrial Estate, Newry, BT34 2PB, N. Ireland
Pumps  Pumping Stations  Pump Monitoring & Control  Booster Pump Sets  Sewage Treatment Systems  Wastewater Treatment Products  Building Services Products  Motor Rewinds  Technology Transfer  Design & Contracting  Service, Operation & Maintenance  Sitemap
 © 2007 FM Environmental Limited. All Rights Reserved.
Design by Eweb Newry