J & P Overseas Ltd  -  LIBYA
 
Completion Date: March 2003
Scope of Works: Design and supply a packaged sewage treatment plant for a working camps in the south west of the Sahara desert in Libya for a population of 900 people.
Plant Supplied: Supplied 3 BIOFILTER SAM sewage treatment plants. The treated effluent quality is BOD : SS 20/30 mg/l, as required for sub-soil irrigation around the camps. All three systems were installed in parallel and below ground. FM engineers also provided the commissioning of the plants.
 
   
More Case Studies
 
 Tel: +44(0) 28 302 66616
Greenbank Industrial Estate, Newry, BT34 2PB, N. Ireland
Pumps  Pumping Stations  Pump Monitoring & Control  Booster Pump Sets  Sewage Treatment Systems  Wastewater Treatment Products  Building Services Products  Motor Rewinds  Technology Transfer  Design & Contracting  Service, Operation & Maintenance  Sitemap
 © 2007 FM Environmental Limited. All Rights Reserved.
Design by Eweb Newry