BP Exploration Limited  -  BP EXPLORATION (LIBYA) LTD
 
Completion Date: March 2010
Solution: Skid mounted mobile plant complete with control room
Capacity; 6m3 /day
Population Equivalent: 30
Project Description: Design, Manufacturing, Supply and Commissioning of two skid mounted mobile plants, complete with inlet pumping stations and controls, that are capable to cater for a population equivalent of 30 people. The plant has no installation requirements on site, and hence a complete packaged solution, just connecting the wastewater inlet, outlet and power supply.

The plant is complete with lifting lugs, ladders and railings for easy and safe access, whilst they can easily be transported from one site to another in case of camp re-location.
 
   
More Case Studies
 
 Tel: +44(0) 28 302 66616
Greenbank Industrial Estate, Newry, BT34 2PB, N. Ireland
Pumps  Pumping Stations  Pump Monitoring & Control  Booster Pump Sets  Sewage Treatment Systems  Wastewater Treatment Products  Building Services Products  Motor Rewinds  Technology Transfer  Design & Contracting  Service, Operation & Maintenance  Sitemap
 © 2007 FM Environmental Limited. All Rights Reserved.
Design by Eweb Newry